Material list - material / weight / time tables



After a scaffold has been created, a material list with the components used can be displayed. The items are displayed in a table and, depending on the sorting, either the quantities for a specific scaffolding system or the quantities for a specific wall/construction phase.

Note

Only the visible tags (see description of construction phases) are evaluated. This allows the material list to be filtered.