Versionen im Vergleich

Schlüssel

  • Diese Zeile wurde hinzugefügt.
  • Diese Zeile wurde entfernt.
  • Formatierung wurde geändert.

Status
colourBlue
titleVersion scaffmax 2021


The following data can be displayed in the tabs of the material list:

Inhalt
maxLevel2

Hinweis
titleNote

Only the visible tags (see description of construction phases) are evaluated. This allows the material list to be filtered.


Scaffolding system/Construction phase

Depending on the sorting (see menu > sorting), tabs are either displayed for each scaffolding system used or for each construction phase.

Example of sorting by construction phase, one tab for construction phase West and one for construction phase South.

Calculation

Various values for time and costs are displayed here, divided into the groups MATERIAL and TIME.


scaffmax Timer

Die Liste enthält alle in der Zeichnung sichtbaren Bauteile (nur die sichtbar geschalteten Tags werden ausgewertet, vergleiche Beschreibung The list contains all components visible in the drawing (only the tags that are visible are evaluated, see description Construction phases).
Die Anzahl der sichtbaren Bauteile wird in der Spalte [Menge] angezeigt. Die Spalte [Zeit] gibt den aktuellen Zeitwert für ein Bauteil an.
Die Spalte [%] zeigt den prozentualen Anteil des Bauteils am Gesamtgewicht aller Bauteile.
Die Bauteile sind nach dem Gewicht (Spalte [kg]) in absteigender Reihenfolge sortiert. Initial werden in der linken Spalte soviele Bauteile aktiviert, bis die Summe aller aktivierten Bauteile 80 % des Gesamgewichts überschritten hat. Die Summe aller nicht aktivierten Bauteile entspricht somit ca. 20 % (80/20-Regel).

Alle aktivierten Bauteile sind in der Liste enthalten, die an den Server gesendet werden kann (siehe Reports > Timerdaten zu Server senden).
Durch Klicken auf die Checkbox können Bauteile aktiviert bzw. deaktiviert werden.

Info

Sortieren Sie die Tabelle durch Anklicken der Kopfzeile in der Spalte Zeit, um ggf. Bauteile zu aktivieren, die zwar aufgrund ihres Gewichts bisher nicht aktiviert sind, aber viel Zeit beim Aufbau erfordern.

Image Removed

Zeiten für den Vertikaltransport

Bei der Berechnung der Materialliste wird der Vertikaltransport jedes einzelnen Bauteils berechnet und im Excelreport summiert für jedes Bauteil ausgewiesen. Die Ergebnisse der Materialliste, also auch der Vertikaltransport, werden ebenfalls an scaffmax Netzwerk zur weiteren Informationsverarbeitung übergeben. Vertikal im Sinne der Timer App bedeutet: Strecke, die das Gerüstbauteil bewegt werden muss, NICHT die Höhe des Teils.

Hierbei benötigt jedes Bauteil einen Bezug zum Gelände, um den Höhentransport berechnen zu können. Der normale Bezugspunkt ist die von SketchUp vorgegebene XY-Ebene, also eine Z-Höhe von 0. Steht die Gerüsteinheit (z. B. eine Wand) auf dieser Höhe ist die Berechnung korrekt. Ist das zu rüstende Gebäude oder ein Teil davon (Wand) in der Höhe nach oben oder unten verschoben, wird die Berechnung fehlerhaft, da der vertikale Transportwert immer von der definierten Geländeebene zur Unterkante des Bauteils berechnet wird.

Boden definieren:

  1. Zeichnen Sie eine Fläche unter das Gerüst.
  2. Selektieren Sie die Fläche und das Gerüst.
  3. Klicken Sie mit der rechten Maustaste auf die Selektion und wählen Sie Gruppieren aus dem Kontextmenü.

Image RemovedImage Removed

Beispiel Excel-Report (zur Zeichnung oben):

Vor Definition eines Bodens: Vertikal

The number of visible components is displayed in the [Quantity] column.The column [Time] indicates the current time value for one component.
The column [%] shows the percentage of the component in the total weight of all components.
The components are sorted by weight (column [kg]) in descending order.Initially, so many components are activated in the left column until the sum of all activated components has exceeded 80% of the total weight.The sum of all non-activated components thus corresponds to approx. 20% (80/20 rule).

All activated components are included in the list that can be sent to the server (see Reports> Send timer data to server).
Components can be activated or deactivated by clicking on the checkbox.

Info

Sort the table by clicking on the header in the Time column in order to activate components that may not have been activated due to their weight, but require a lot of time to assemble.


Image Added

Times for vertical transport

When calculating the material list, the vertical transport of each individual component is calculated and summed up in the Excel report for each component. The results of the material list, including the vertical transport, are also transferred to scaffmax Netzwerk for further information processing. Vertical in the sense of the timer app means: the distance that the scaffolding component must be moved, NOT the height of the component.

Each component needs a reference to the terrain in order to be able to calculate the height transport. The normal reference point is the XY plane specified by SketchUp, i.e. a Z height of 0. If the scaffolding unit (e.g. a wall) is at this height, the calculation is correct. If the building to be scaffolded or a part of it (wall) is shifted up or down in height, the calculation will be incorrect because the vertical transport value is always calculated from the defined terrain level to the lower edge of the component.

Define ground:

  1. Draw an area under the scaffolding.
  2. Select the area and the scaffolding.
  3. Right-click the selection and choose Make Group from the context menu.

Image AddedImage Added

Example Excel report (for drawing above):

  • Before defining a ground: Vertical = -6,0 (= 3 Unterlagsbohlen planks * 2m)Nach Definition eines
  • Bodens: Vertikal After defining a ground: Vertical = 0,0 (da jetzt die Fläche unter dem Gerüst als Bezugspunkt zur Berechnung verwendet wird)

Image Removed

Image Removed
  • since the area under the scaffolding is now used as a reference point for the calculation)

Image Added

Image Added

Editing values

The content can be edited by double-clicking on a field in the material list.

Column ±

The column ± in the material list is used for checking. It shows how many components are in the SketchUp drawing that are not in the material list. The missing components can be assigned to tags that are currently switched off (see description of construction phases).