Changelog - V2021.1.5
System
- Several "items", "own components" or "assemblies" can be combined in a group that can be evaluated using the Construction tag.
The terminology of the tag has been adapted for the English version of scaffmax. This is now Construction.
Item list (simple, simple-2020 and detail-2020)
- When scaffolding manually, it could happen that the last item placed disappears. This has been corrected.
- The insertion of items from the item list into an existing group with the "CTRL" key has been optimized.
- The first time the item list was called up, an incorrect image was displayed. This has been corrected.
Scaffolding
- In certain geometrical situations in which the left end points of a wall are not perpendicular, the wall was not scaffolded. A correction factor was built in here so that such walls are also scaffolded.
Scaffolding systems*
- Corrections to the Tobler Mato 1 scaffolding system (click points added, item positions corrected)
- Corrections to the Altrad-Mostostal Mostostal scaffolding system (item added to the external staircase)
- Corrections to the Scafom Ringscaff scaffolding system (item added to the external staircase)
- Corrections to the scaffolding system Albert BLITZFIX and UNITAC (the color of the board boards was corrected)
- Corrections to the PERI UP Easy scaffolding system (scaffolding tubes 50, 150, 250, 350 added, click points corrected, English translation adapted)
- Corrections to the PERI UP Flex scaffolding system (scaffolding tubes 50, 150, 250, 350 added, click points corrected, English translation adapted)
- Corrections to the Plettac SL-70-100 scaffolding system (click points corrected)
- Corrections to the MJ UNI-70-100 scaffolding system (click points corrected)
- Corrections to the Layher Allround scaffolding system (names corrected)
- Corrections to the Rux Ringscaff framework system (item added)
- Corrections to the Rux Super-65-100 scaffolding system (item added)
- New scaffolding system - Breuss - WEPA
*Please note that the scaffolding systems must be reloaded after the update in order to update the renewed wall files.
Functions
- Under the "System Administration" it could happen that the "Key-width" 19 or 22 were misaligned when changing the scaffolding, this has been corrected. ATTENTION: The respective components per system are currently being adapted.
- With the option "User data of the components" and "Editing the component data" it could happen that the edited item numbers in the item list resulted in the material list not opening, this has been corrected.
- New function under "scaffmax functions" dialog for determining wall areas.
Material list
- It could happen that the material list was not opened in drawings with "Sections"; this has been corrected.
WIKI
- New FAQ about construction phases.
- New FAQ about the tag SC_Cells.
- We have supplemented the system information for you.